Two-pass RO equipment with pretreatment vessels, pumps and a control cabinet.

Industrial Reverse Osmosis Water Treatment System Supplier

Water Treatment for Cosmetic, Skin-Care and Personal-Care Production

We supply single-pass and two-pass RO systems, with RO + EDI combinations configured for your source water and product-water specification. Our RO reference sizes span approximately 500–20,000 L/h, with storage, transfer and control options assessed around formulation, rinsing and cleaning duties.

  • ●Single-pass and two-pass RO
  • ●EDI polishing options
  • ●Storage and control integration

Choose the Treatment Route for Your Water Specification

Output and water quality are separate selection decisions. Start with the required volume, then choose the treatment route that can meet the defined quality target under the available feed-water conditions.

Single-pass RO equipment with horizontal membrane housings, pumps and a control panel.

Single-Pass RO Water Treatment Systems

Pretreated feed water passes through one RO purification step. Evaluate this configuration when one pass can meet the required product-water specification for your source water.

Selection: Compare source-water analysis and target product-water conductivity.

Discuss a Single-Pass RO System
Two-pass RO equipment with pretreatment vessels, pumps and a control cabinet.

Two-Pass RO Water Treatment Systems

Permeate from the first RO pass feeds a second RO pass for further reduction of dissolved ions. This double-pass arrangement is a separate purification step, rather than concentrate recirculation through the same pass.

Selection: Compare the conductivity target with the additional equipment, electrical load and overall water balance.

Discuss a Two-Pass RO System
RO and EDI equipment in a combined water purification configuration.

RO + EDI Water Purification Systems

An electrodeionization module polishes RO permeate to reduce remaining dissolved ions. The upstream RO arrangement and EDI inlet requirements are assessed together; EDI is not a third RO pass.

Selection: Compare the final ionic-quality target and the selected EDI module's feed conditions.

Discuss an RO + EDI Configuration

Match Process Water to Its Production Duty

Production duty Where the water is used What matters for selection
Creams, lotions and emulsionsWater-phase preparation and vessel chargingDefined ingredient-water quality, batch volume and charging time
Toners, essences and water-based serumsWater incorporated into the formulationFormula-specific chemical and microbiological criteria
Skin-care gelsPreparation of the water-based formulationRequired water specification and production schedule
Equipment and line rinsingVessels, pipework and filling contact partsRinse-water criteria, peak consumption and the cleaning procedure

A product name alone does not determine whether single-pass RO, two-pass RO or EDI is needed. Use your formulation and quality requirements to define the water specification, then match production and storage to the actual duty.

Water treatment
↓
Product-water storage and transfer
↓
Mixing and formulation / Equipment rinsing and cleaning

Treatment, storage and downstream equipment are coordinated within the agreed project scope.

From Feed Water to the Point of Use

Reverse osmosis uses pressure to move water through a semipermeable membrane, producing a lower-salt permeate stream and a separate concentrate stream. Pretreatment addresses the source-water conditions before the membrane process; storage and transfer carry the treated water to production.

  1. Feed water
  2. Selected pretreatment
  3. High-pressure pump
  4. RO separation
  5. Selected further treatment
  6. Product-water storage
  7. Transfer to points of use

Concentrate branch: RO concentrate → Concentrate outlet

Single-pass: RO permeate → Storage

Two-pass: First-pass permeate → Second-pass RO → Storage

RO + EDI: Selected RO permeate → EDI → Storage

Optional treatment stages and downstream equipment are selected for the project. This is a process overview, not an installation drawing.

Source-Water Differences Can Change the Required Treatment

Hardness, suspended matter and residual chlorine can change the pretreatment requirement even at the same nominal output. We select sand filtration, activated carbon, softening where needed and cartridge filtration around the source-water analysis and membrane process.

Adding Treatment Stages Does Not Define the Whole Water Specification

A second RO pass or EDI can address a lower ionic-content target. Microbiological quality, storage and distribution still require their own criteria and operating controls. We discuss those boundaries with the selected treatment configuration.

A Short Batch Draw Can Be Larger Than the RO Production Rate

Charging a mixing vessel can create a brief demand peak. We assess storage, transfer-pump duty and replenishment together, instead of sizing the RO unit from the largest instantaneous draw alone.

RO Output Options and Water-Quality References

Reference RO Capacity Options

Scroll horizontally to view the full table.

Nominal water output (T/h) Approximate water output (L/h)
0.5500
11,000
22,000
33,000
55,000
66,000
1010,000
2020,000

These are reference sizes across the RO range, using approximately 1,000 L per tonne of water. Output for a selected two-pass or RO + EDI package depends on the treatment train and operating conditions. Installed power, footprint, membrane configuration and utility requirements are specified for the quoted equipment.

Compare the Water-Quality Target

Scroll horizontally to view the full table.

Treatment configuration Reference product-water conductivity Treatment distinction
Single-pass RO≤10 µS/cmOne RO purification pass after pretreatment
Two-pass RO2–3 µS/cmFirst-pass permeate receives a second RO treatment
RO + EDI≤0.5 µS/cmEDI polishes permeate from the selected RO arrangement

The conductivity references use feed-water conductivity ≤300 µS/cm. They are not an unconditional guarantee for every source water. Final feed conditions, temperature basis, product-water criteria and test methods are agreed for the selected configuration. Water outside this reference basis requires a separate design assessment.

Reference RO recovery is 55–75%. Overall package recovery must account for the selected treatment stages, flushing and other operating losses.

Controls and Options Matched to the Treatment Duty

Our configuration range connects treatment choice with operating controls and downstream equipment. Level-based operation supports replenishment, online conductivity makes ionic-quality changes visible, and selected flushing functions support routine operation.

Control function Operating role
Storage-level stop and restartStops production when the product-water tank is full and restarts when replenishment is required
Timed pretreatment flushingRuns the selected filter-media flushing sequence
Automatic RO membrane flushingPerforms the configured membrane-flush sequence
Online conductivity displayDisplays feed-water and product-water conductivity for operational monitoring

The operating sequence and included controls are defined for the selected configuration. Automation does not replace inspection, cleaning or routine maintenance.

Further Configuration Options

Option group Scope to assess
Additional treatmentA second RO pass, EDI or mixed-bed polishing for the defined water specification
Water-hygiene equipmentUV or ozone equipment where appropriate to the selected water-system design
Storage and transferProduct-water tanks, transfer pumps and circulation arrangements
Additional automationOnline pH adjustment, off-spec water return with an alarm, and production-data recording in relevant control configurations

These options are selected by function and compatibility, not supplied as one universal package. Control functions, monitoring points and the equipment list are set out for the project.

Coordinate Water Treatment with the Rest of Production

Our range also includes mixing equipment, process vessels, pumps and cleaning systems. Bringing these interfaces into the same project discussion helps define water production, storage, transfer and use together for a single-machine purchase, an upgrade or a new line.

Plan Storage for Batch Demand and RO Replenishment

Our purified-water storage options include reference volumes of 1,000, 2,000, 3,000, 4,000, 5,000, 6,000 and 10,000 L. Single- or double-wall construction, vertical or horizontal layouts, insulation, venting and cleaning connections are assessed for the selected tank duty.

Nominal tank volume is different from usable storage. Operating levels, reserve volume, peak draws and refill time determine how much water is available to production. Transfer-pump flow also needs to match the required charging or circulation duty.

Daily formulation, rinsing and cleaning demand ÷ Planned production hours = Starting average production requirement

Average demand starts the sizing discussion. Check peak withdrawal, usable tank volume, feed-water temperature and replenishment time separately.

Understand the Feed and Concentrate Requirement

Illustrative RO Water Balance at 60% Recovery

  • Product water1.00 m³/h
  • Feed waterapprox. 1.67 m³/h
  • Concentrateapprox. 0.67 m³/h

Feed flow = Product flow ÷ Recovery

This steady-state calculation excludes flushing, EDI reject and other additional losses. It is a sizing illustration, not a quoted system performance.

The feed-water supply and drain need to support the complete package balance. Select recovery with the water analysis and treatment design, rather than assuming that the highest percentage is always suitable.

Project Support, Delivery and Warranty

KOZMAG provides one contact for equipment selection, technical questions and after-sales support. We coordinate treatment, storage and production interfaces around the agreed equipment scope.

Item Arrangement
Lead timeIndividual-machine orders typically take 30–60 days after order confirmation, depending on configuration. Integrated water-system projects are scheduled per project.
Installation and commissioningYour team can install the equipment with our remote guidance. On-site installation and commissioning are available at additional cost.
Operator trainingVideo-call training or on-site training during an agreed installation visit
WarrantyTwo years, excluding wear parts; the quotation defines component coverage and exclusions for the selected package
Spare parts and consumablesThe recommended items and any included spares are agreed with the equipment scope

Agree Documentation and Acceptance Before Ordering

Define the required operating instructions, electrical drawings, packing list and any project-specific layout or process documents in the order. The acceptance plan should identify the feed-water conditions, output, water-quality criteria, measurement method and test points.

Where test records or a running video are part of the agreed delivery, assess them against that plan. A video shows the demonstrated operation; it does not replace the specified water-quality tests.

About KOZMAG →
Equipment and utility scope
↓
Documentation and acceptance plan
↓
Installation and operator support

Industrial RO Buyer Guide

What Should a Source-Water Analysis Cover?

Identify the water source and include conductivity or TDS with units, pH, hardness, turbidity, residual chlorine and water temperature. Iron, manganese, silica and other constituents may also matter for the source and membrane process. A conductivity reading alone is not a complete pretreatment specification.

For our single-pass, two-pass and RO + EDI configurations, the report needs to describe the water entering the proposed system. Existing pretreatment and seasonal variation can change that starting point.

Does Lower Conductivity Make Water Hygienically Suitable?

Lower conductivity indicates lower ionic content; it does not demonstrate microbiological control. Formulation water and final-rinse water need criteria suited to their intended use. Storage, distribution, cleaning and monitoring remain part of that assessment after the RO unit.

Ionic quality → Conductivity and relevant chemical tests.

Microbiological quality → Defined sampling, testing and system-control procedures.

Tank vent filtration and UV or ozone equipment must be assessed for their specific roles. None should be treated as a stand-alone guarantee of sterile storage or a substitute for an agreed cleaning and monitoring program.

How Should I Compare RO System Quotations?

Compare the same feed-water analysis, required output, operating hours and product-water criteria. Then compare the scope: pretreatment, number of RO passes, EDI, tank, pumps, controls, installation support and acceptance requirements.

Purchase scope → Equipment, documentation and support included in the quotation.

Operating cost → Feed water, concentrate disposal, electricity, consumables and maintenance for the selected treatment train.

Additional stages should address a defined requirement. A lower price or a larger equipment list alone does not establish the better fit.

What Determines the Maintenance Plan?

Feed-water quality, operating hours, fouling tendency and the selected stages affect maintenance. Filter media, cartridges, RO membranes and EDI equipment have different service requirements. Automatic flushing and conductivity display assist operation, but do not replace inspection, cleaning or replacement when required.

Use the selected equipment instructions and observed operating condition to plan service. Consumables, spare parts and warranty exclusions should be identified in the order rather than assumed from a general equipment description.

Connect Water Treatment with Your Processing Equipment

Water production, storage and transfer need to work with the timing of mixing and cleaning. Explore our mixing equipment or discuss the interfaces required for your project.

Discuss Your RO Water Treatment Requirement

Share your source water, target water quality and required output. We will use these details to discuss the treatment configuration, storage and support scope for your production duty.

Include daily demand, peak batch draws, operating hours, the available water analysis, storage or circulation needs, site power supply and the installation location where known.

Email: sales@kozmag.com

Phone / WhatsApp: +86 18958878116

Room 602, No.108, Lane 308, Xumin Road, Qingpu District, Shanghai, China